Let’s build a Vertical Stabilizer

11/28/14                                                                                                                                  

I have an old (3 megapixel) Olympus camera that is now dedicated to recording the build.  I keep it in the tool chest for photos such as these.

OLYMPUS DIGITAL CAMERA

In building the Vertical Stabilizer, the first task is to smooth all edges and slightly round the corners of all the parts.

Vertical Stabilizer rear spar and reinforcing plate.
Vertical Stabilizer rear spar and reinforcing plate.

 

 

 

 

 

 

 

OLYMPUS DIGITAL CAMERA

The lightening holes in the reinforcing plate are punched at the factory and have rough edges, as on the center hole shown in the photo on the right.  The other two shiny holes have been finished with a Scotchbrite wheel on a drill and then a hand held Scotchbrite red pad. Continue reading “Let’s build a Vertical Stabilizer”

A Milestone

11/23/14

This week the horizontal stabilizer parts were abraded with ScotchBrite, cleaned with acetone and labeled in Sharpie blue.

Ready for priming.
Ready for priming.

I built a spray table from 1/2 inch PVC.  Wire cloth was stretched between two sides.  The sides with the legs rotate so the whole thing folds flat for storage. The table was placed on a plastic tarp on our lanai  (that’s a screened back porch for you northerners).

All primed and ready for assembly.
All primed and ready for assembly.

Internal surfaces were painted with SEM self etching rattle-can primer.  I chose one part primer for these interior parts for simplicity of process.  Our 66 year old Globe Swift has no interior primer in the fuselage and the metal still shines.  We’ll move up to two part epoxy primer for the cabin interior and other wear and tear areas. Continue reading “A Milestone”

Eleven Days In

11/16/14

The FAA says amateur building is to be an educational process.  It sure is.  We are learning not only new mechanical skills but also new ways of thinking and communicating.

Left horizontal stabilizer skeleton.
Left horizontal stabilizer skeleton.

 

We are eleven days into the metalworking and have yet to set the first rivet.  The parts in Vans kit are formed and most holes punched, but they all require smoothing of edges, resizing of holes, deburring of drilled holes, etc.

Van’s construction instructions start off being very detailed.  We soon found that details are needed which are not in the instructions and only exist in the plan drawings.

 

 

Skin on and ready for match drilling of skin to rib and spar flanges.

 

We started drilling skins to the ribs following the instructions and not noting that the drawing wanted a smaller drill size than in the previous instruction.  A phone call to Vans gave relief.  It’s OK to use larger rivets (1/8 vs 3/32″) on the inboard rib providing edge clearance rules are not violated.  Fortunately our edge distances are OK.

 

 

One hole at a time.

As a result of my drilling snafoo we built a new rule.  Dolly and I will each independently read plans and instructions for any construction step. and come to a common understanding of what is to be done. Continue reading “Eleven Days In”